There are 20 year old engineering school bros all over the country doubled over laughing at this right now. This is the sort of the thing that the professor delays his planned material in order to brief to the students.

I remember when the bridge-that-diversity-built collapsed in Florida, and we were like, "so, women engineers, amirite?"
@RR There are several stakeholders who caused this.

#1 being the structural engineering company who did the design. Probably zero investigation into the structure (to save money).

#2 being the developer putting pressure on the master engineering firm (JMV Associates) and the Prime contractor to meet a deadline.

#3 Prime contractor's "means and methods" to do the work. A lot of times they cut corners and use this as an excuse, bypassing engineering standards.

#4 "Independent inspection or 3rd party inspectors". Usually pretty worthless. They show up to the site for a short while and bitch about tiny ticky tacky shit while ignoring those YUGE CRACKS IN THE COLUMNS. Then go do a 3-hour lunch.

#5 Master engineering firm (Engineer of Record (EOR). Takes all the credit (and money) because they are a minority owned business that doesn't do any of the work (farms it out). Blames everyone else if the project fails.

>I was invested in a $4B project with Fed/State/City funding with about 70 different contractors/subs. What I saw behind the curtain is what you would expect. It was like 10 seasons of Survivor rolled into 4.
@Chzikken_1486 >The conversion also includes 100,000 square feet (9,300 m2) of amenities such as a fitness center and a rooftop swimming pool.
>rooftop swimming pool

really nigga

I wonder what the foundation is like. it had better be tied directly into quartzite bedrock or something